Permits

The Building Permit Center group consist of Building Permit Technicians and Building Call Center staff. The Permit Center handles a wide range of permits which include building permits, public improvement permits, sign permits, lawn and irrigation permits and chicken permits. If you are needing to check on the status of a permit, plan review, schedule inspections or have code questions you can reach the Building Permit Center staff at 303.739.7420 or email us at [email protected]

Beginning August 1st, 2026, the City of Aurora (in conjunction with the State of Colorado)  will transition to the requirements of the 2026 National Electrical Code (NFPA 70).

Any applications for permit of electrical work received after July 31st, 2026, will be reviewed and inspected to the 2026 NEC requirements.

Any permits pulled from existing single-family master plans will automatically be processed under the 2026 NEC.

Any multifamily master plans will need to submit revisions to show compliance with the 2026 NEC before further permits are pulled.

 



City of Aurora | All Rights Reserved | Powered by CivicLive | © 2026 Civiclive.